Stars Over the River Drin

Stars Over the River Drin

Play Trailer
0 / 10

69min / April 25, 1978

Drama
Description
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
Production Companies

Related Movie

0% Match1970
0% Match1969
25% Match1970
0% Match1977
0% Match1977
65% Match1978
60% Match1978
0% Match1977
0% Match1976
0% Match1976
0% Match1973
65% Match2006
0% Match1968
0% Match2025
79% Match2025
64% Match1964